Offset Eye Closed Mesh Standard Length Slack Pulling Grip

US$3.00 - 15.00 1 Piece (MOQ)
Port:
Shanghai, China
Production Capacity:
100000pieces/Month
Payment Terms:
L/C, T/T, D/P, Western Union, Paypal, Money Gram

Last Login Date:

Aug 01, 2025

Main Products:

Feeder Clamp, Grounding Kit, Cable Hanger, Angle Adapter, Rubber Grommet, Stand-off Kit, Cable Grip, Cable Entry, Copper Lug, Coaxial Block

Find Similar Products
US$60.00-300.00
5 Pieces (MOQ)

Product Description

Company Info

Basic Info.

Model NO.
Slack Pulling Grip
Type
Wire Mesh Grip
Certification
RoHS, ISO, SGS
Customized
Customized
Condition
New
Feature
Fire/Flame Retardant
Product Line
Pulling Grip
Product Type
Slack Pulling Grip
Material
Stainless Steel/Galvanized Steel/Tinned-Bronze
OEM
Acceptable
Trademark
Maxdao
Transport Package
Plastic Bag, Carton, Pallet
Origin
China

Product Description

Product Description

Slack Pulling Grip--offset eye,closed mesh,standard length

  • Slack grips feature an offset eye for easy attachment to the pulling line.
  • High strength galvanized steel wire mesh.
  • Used when cable end is accessible.
  • Single offset eye easily mates to swivel and line type connectors as well as easy attachment to pull line.
  • Used in factory maintenance and construction, utility work and replacement of underground cable.
  • Slack grips are reusable grips used for pulling slack in underground cable preparatory to final placement.
  • Also used for cable removal.
Part NumberCable DiameterMesh LengthApprox Break Strength
OSG0220.75-0.99"(19.1-25.1mm)13"(330.2mm)3000 lbs.
OSG0251.00-1.24"(25.4-31.5mm)16"(406.4mm)4200 lbs.
OSG0321.25-1.49"(31.8-37.8mm)17"(431.8mm)5500 lbs.
OSG0381.50-1.74"(38.1-44.2mm)18"(457.2mm)7400 lbs.
OSG0421.75-1.99"(44.5-50.5mm)19"(482.6mm)11000 lbs.
OSG0502.00-2.49"(50.8-63.3mm)20"(508.0mm)11000 lbs.
OSG0602.50-2.99"(63.5-76.0mm)21"(533.4mm)11000 lbs.
OSG0753.00-3.49"(76.2-88.6mm)22"(558.8mm)16000 lbs.
OSG0903.50-3.99"(88.9-101.3mm)23"(584.2mm)16000 lbs.

Product Test


Company Information


Certificate
Packaging & Shipping

Trade terms

FOB, EXW, CIF, DDU, DDP
Payment termsT/T, L/C, Negotiable
MOQ1
Supply capability100000 pieces per month
Lead timeusually 10 working days
ShipmentExpress, air, sea
PortShanghai, Ningbo, Shenzhen
Sample availabilityYes
Sample timeusually 3-5 days
Packaging

Normal: Plastic bag & Carton & Pallet

Special: Customized packing

Send your message to this supplier
Mr. Adolf Wang

Post a Sourcing Request Now

People who liked this also liked