Product Description
Heavy Duty Pullling Grip--single eye
- Pulling Grips have either single or double eye for attaching to the pulling rope.
- The correct pulling grips eases low and high voltage cable pulling into ducts, trenches and conduits.
- Provide an efficient method for cable installation and support within their load carrying capacity.
Part Number |
Cable Diameter |
Eye Length |
Mesh Length |
Approx Break Strength |
CS0613 |
0.25-0.52"(6.3-13.2mm) |
3"(76.2mm) |
9.0"(228.6mm) |
1680 lbs. |
CS1319 |
0.53-0.74"(13.4-18.8mm) |
3"(76.2mm) |
14"(355.6mm) |
2240 lbs. |
CS1925 |
0.75-0.99"(19.0-25.1mm) |
4"(101.6mm) |
16"(406.4mm) |
5600 lbs. |
CS2538 |
1.00-1.49"(25.4-37.8mm) |
6"(152.4mm) |
18"(457.2mm) |
7840 lbs. |
CS3850 |
1.50-1.99"(38.1-50.5mm) |
8"(203.2mm) |
21"(533.4mm) |
11200 lbs. |
CS5063 |
2.00-2.49"(50.8-63.2mm) |
10"(254.0mm) |
24"(609.6mm) |
11200 lbs. |
CS6389 |
2.50-3.49"(63.5-88.6mm) |
12"(304.8mm) |
27"(685.8mm) |
13440 lbs. |
CS89115 |
3.5-4.50"(89.0-114.3mm) |
12"(304.8mm) |
27"(685.8mm) |
15680 lbs. |
Product Test
Company Information
Certificate
Packaging & Shipping
Trade terms |
FOB, EXW, CIF, DDU, DDP |
Payment terms |
T/T, L/C, Negotiable |
MOQ |
1 |
Supply capability |
100000 pieces per month |
Lead time |
usually 10 working days |
Shipment |
Express, air, sea |
Port |
Shanghai, Ningbo, Shenzhen |
Sample availability |
Yes |
Sample time |
usually 3-5 days |
Packaging |
Normal: Plastic bag & Carton & Pallet
Special: Customized packing |